Overview
This invitation for bids concerns the construction and completion of W-04, which involves the construction of a distribution network in extension areas, including DMA and service connections with meters, along with 2 years of operation and maintenance.
Key Responsibilities
- Construction of distribution network in extension areas including DMA and service connection with meters.
- 2 years of operation and maintenance.
Required Experience
- Minimum average annual construction turnover USD 28 million during the last five years.
- Participation in at least one similar contact to the proposed works within the last 10 years successfully or substantially completed where the value of the Bidder’s participation exceeds USD 25 million.
- Construction of pipelines more than 200 km (63mm to above dia.) in a Water Supply Network in one contract.
- Horizontal directional drilling (HDD)/ Pipe Jacking Method of pipelines in a contract length ≥ 10 km (63mm to above).
- DMA (District Metering Area) established in one contract ≥ 10 nos.